We have recently completed the R.A.A.C reinforcement to the 6th Form at Bishops Douglas school.
The works consisted of the engineered timber joist construction, suspended ceilings and LED/ emergency lighting.
The 500m2 area covered numerous classrooms, IT room, Chapel and Common room.
The works consisted of the engineered timber joist construction, suspended ceilings and LED/ emergency lighting.
The 500m2 area covered numerous classrooms, IT room, Chapel and Common room.
R.A.A.C Bishops douglas school, London
Duration: 4 weeks
Completion:
30 November 2023
Client: BSD/ PCH
Architect: PCH Associates
Engineer: Sweco Engineers